Sign In | Join Free | My udpf.com
China Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.
Verified Supplier

2 Years

Home > Bailey Bridge >

Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge

Brand Name : Tongkai

Model Number : Compact 100

Certification : ISO9001, EN1090,ISO3834

Place of Origin : China

MOQ : 1set

Price : FOB1000USD

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 500T/M

Delivery Time : 15days

Packaging Details : Nude Packing ,Steel case

Material : S460J0,S355JR,S235JR

Color : Green, Grey, Orange,Red

Load : HS15,HS20,HS25,HL-93,HA ,HB

Net Width : 3.15m, 3.6m,4m

Footway : 1m, 1.2m,1.5m

Contact Now

Brief Introduction

Specification

* Standard : ASTM, GB,BS

* Material : S355Jr, S460J0

* Panel Size : 3000/3048mm * 1500mm*176mm

* Type : heavy

* Footway : single or double side, 1m ,1.2m & 1.5m

* Application Scope : Road Construction ; Railway Construction ;

Emergency Usage ; Military Usage

Introduction:

Bailey Bridgeis a standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. The bridge has the advantages of few components, light weight and low cost. Bailey bridge is similarly like compact 100,compact 200 International bridge. it is assembled by each 3m panel, and invented by Donald Bailey. The 321 panel bridge can be easily dissembled and rapidly erected. The whole bridge is made by high-tensile strength steel. Main beam is light weight panels and the panels are connected by panel connection pins. It is easy to assemble or disassemble and transport. It can also be assembled into different forms of panel bridges according to their span length and transportation requirement. So, it has been widely applied as emergency transportation, temporary or permanent bridge. Its suitable load design is such like HS-15, HS-20, HS-25 and pedrail-50 etc.

Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge


Panel
The panels are monolithic unit welded in the factory and assembled by panel pin on the construction site, and the main structures are assembled according with the request of span and loading. The hole-to-hole distance of panel is 3000mm/3048mm, and the height is 1500mm. Each panel top and bottom chord has interlocking male and female lugs into which the panel pins were inserted. The bottom chord has bottom chord has 4 transom seats. the material of up and down chord is 10# channel steel and the middle is 8# I-beam steel.
Joint systems

Transom Clamp, a screw lock clamp that secures the transom to the panel, 3.0kg

Sway Brace: fitted under the roadway and ran from one end of the lower run of the inner panel to the diagonally opposite end, 33kg

Rakers: fastened to the top run of the panel and a lug near the end of the transom. These kept the panel vertical, 11kg

Decking system
The deck system is made up of transom and deck. The transom connects with panel and deck by U- bolt and L-bolt. The material for transom is Type I-beam steel, the deck size is 3042×1050 Transom; 18 foot long, 10 inches high and 4 ½ inches wide clamped to the panels using transom clamps.
Transoms had lugs on the top surface to locate the roadway decks. There were holes drilled through the transom to allow the transom to be carried using lifting bars. The deck is fixed on the transom by U- bolt.
End system
The bridge end is composed of End Male Post, Female End Post, Tie Beam, Bearing and Bearing Plate
Launching equipment and tools
The launching equipment and tools are made up of nose, roller, rock roller, joint, bolt and various spanners. The max loading of roller is 25t and the rock roller id 6t. The nose is netlike structure assembled by bridge components (not offered in this project).
Erection Method: Cantilever Launchin g Method,Crane Lifting
Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge


Product Tags:

S460J0 Mabey Bridge

      

S235JR Mabey Bridge

      

S355JR temporary bridge

      
Best Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge wholesale

Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR Temporary Bridge Mabey Bridge Acrow Bridge Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)